First Principles Constructors

  • 21-25 Martin Square, Te Aro, Wellington
  • Commenced April 2025
  • $1.4M
  • Workshop conversion to office building with full fit-out; floor area increase of 120m2
  • Architect: Studio of Pacific Architecture Limited
  • Structural Engineer: Silvester Clark Limited
  • Fire Engineer: Cognition Limited
  • Client: First Principles Constructors Limited

This project is a redevelopment of an existing workshop building at 21 Martin Square, into a modern open-plan head office space for First Principles Constructors.

The project involves a total strip-out to bare bones, construction of a new concrete mezzanine floor, new roof structure and insulated roof with skylights and clerestory windows; new aluminium window and door joinery, and a façade refresh.

The interior works include construction and fitout of new offices, a feature stair, meeting rooms, a boardroom, a kitchen, and a gym. With no ceilings and a mix of new and old structural elements on display, this project features multiple exposed finishes and services, alongside feature wall linings and floor finishes, creating an exciting working environment with a distinctly industrial vibe. All new electrical, mechanical, plumbing, and fire services will be installed, including a new sprinkler system.

Project Manager: Gazelle Moinfar
Quantity Surveyor: Matt Titchener
Site Managers: Harry Bampton
Project Coordinator: Beckie McKinney